Lifting & Engineering Platform · 2026
Temporary Works Design, Automated

Crane platforms, haul roads, protection slabs, scaffolding, falsework and lifting plans — designed, checked and reported to UK standards in minutes, not days. Built by temporary works engineers, for TWDs, TWCs, APs and site engineers. TWf2019:02 · BR470 · CIRIA C769 · TG20 principles · BS 5975 · EN 13000.

6
Live design modules
10+
UK standards covered
132
Automated calc tests
5
Published hand-calc checks
All Modules

How It Works

Each tool follows the same three-step pattern. Click a module below to see exactly how to use it.

🏗Lifting Commandor
EN 13000 · ISO 4305
  1. 1
    Enter inputs on the sidebar — working radius, load weight, hook height, crane type and obstacle data.
  2. 2
    Tick the disclaimer box — unlocks: Crane Selection results
  3. 3
    Rate the tool to unlock Stage 2 & 3 — unlocks: Ground Load Calculations → Lifting Plan → PDF & DOCX Download
📏Crane Working Platforms
TWf2019:02 · BR470
  1. 1
    Enter inputs on the sidebar — plant type, loading from manufacturer datasheet, subgrade CBR or Cu. Upload borehole log for auto-interpretation.
  2. 2
    Tick the disclaimer box — unlocks: Design Results · Cross-Section Sketch
  3. 3
    Rate the tool to unlock documents — unlocks: PDF Calculation Report · TW Design Brief · Risk Assessment · RAMS
🛣Haul Roads
CIRIA C769 · BS 8006-1
  1. 1
    Enter inputs on the sidebar — vehicle loading, axle configuration, number of passes, subgrade CBR and seasonal factors.
  2. 2
    Tick the disclaimer box — unlocks: Summary Results · Cross-Section · Layer Schedule
  3. 3
    Rate the tool to unlock documents — unlocks: PDF Report · TW Brief · Risk Assessment · Inspection Checklist · RAMS
📦Protection Slabs
BS 8110 · EC2 · BS 5975
  1. 1
    Enter inputs on the sidebar — utility type, pipe diameter, cover depth, design vehicle and subgrade CBR.
  2. 2
    Tick the disclaimer box — unlocks: Summary · Cross-Section · Calculations · Recommendation · Option Comparison
  3. 3
    Rate the tool to unlock documents — unlocks: TW Brief · Risk Assessment · Inspection Checklist · RAMS · Calc Report
🏗Scaffolding
BS EN 12811-1 · BS 5975
  1. 1
    Enter inputs on the sidebar — scaffold type, bay width, lift height, loading class, wind zone, tie pattern and bracing layout.
  2. 2
    Tick the disclaimer box — unlocks: Summary · Wind · Configuration · Member Checks · Ties & Stability · Sketches · Lessons Learned
  3. 3
    Rate the tool to unlock documents — unlocks: TW Design Brief · Risk Assessment · RAMS · PDF Report
🏗Falsework
BS 5975:2019
  1. 1
    Enter inputs on the sidebar — falsework system, slab/beam geometry, concrete pour weight, wind zone and construction loading.
  2. 2
    Tick the disclaimer box — unlocks: Summary · Systems · Loads · Wind · Grid Layout · Compression · Bracing · Ground · Sketches
  3. 3
    Rate the tool to unlock documents — unlocks: TW Design Brief · Risk Assessment · Inspection Checklist · Report & RAMS
Compliance

Standards-First
Engineering

Every calculation references a specific clause. Formula derivation shown in full in every downloaded report.

EN 13000
§3.3 · Annex B
Mobile cranes — wind loads, stability, and outrigger reaction formula (4-point rigid).
ISO 4305
§5 · Table 1–3
Crawler track ground pressure. Eccentric load formula with φ=0.85 contact factor.
EN 13001-2
§4.2 · Table B.1
Wind force coefficients. Cf=1.3 (box boom), Cf=1.6 (lattice boom) — applied per crane type.
BS 7121
Parts 1–4
Safe use of cranes. Lifting plan content requirements referenced in every document template.
LOLER 1998
Regulation 8
Lifting operations and equipment. Appointed Person requirements referenced in all reports.
PUWER 1998
General
Provision and use of work equipment. Suitability and inspection requirements referenced.
BS 5975
2019 · Code of Practice
Temporary works procedures and permissible stress design of falsework. Core reference for all TW design and coordination.
CDM 2015
Regulation 11 · 12
Construction (Design & Management) Regulations. Principal Designer and Contractor duties for temporary works risk.
BS EN 12811-1
Performance & Design
Temporary works equipment — scaffolds. Performance requirements and general design principles.
TWf2019:02
BR470 · Calibrated
Working platform design. Verified against HS2 SL4 reference data. ULS, SLS and geogrid methods.
CIRIA C769
2019
Temporary haul roads design, construction and maintenance. Giroud & Han 2004 method applied.
Eurocodes
EC0 · EC1 · EC2 · EC7
Structural design basis, loading, concrete and geotechnical design. Referenced in TW structural calculations.
Proof, Not Promises

Validation Evidence

Every design engine has been verified against independent hand calculations, step by step, to machine precision — and the worked examples are published here for you and your checker to scrutinise. Each engine is also protected by an automated regression suite (132 tests across the five temporary works modules) that runs on every code change.

Crane Platforms
TWf2019:02 · BR470 · EC7
Crawler crane platform on cohesive subgrade: punching-wedge ULS (both BRE cases), settlement, PLT regime. Utilisations 95.8% / 99.9% reproduced exactly by hand.
View the worked calculation →
Haul Roads
CIRIA C769 · BS 8006-1
45t ADT on firm clay: contact geometry, bearing capacity, geogrid-reinforced thickness and layer schedule. Reinforced vs unreinforced build-up matched to 4 decimal places.
View the worked calculation →
Protection Slabs
IGEM/TD/1 · HA 39/01 · BS 8110 · EC2
HP gas main under plant crossing: DAF, Boussinesq crown stress, span sizing, RC design. Includes the audit finding we found, fixed and regression-locked — in the open.
View the worked calculation →
Scaffolding
TG20 principles · EN 12811 · EN 1991-1-4
20m × 12m independent tied scaffold, SC3, London wind: full wind chain, member checks, EC3 buckling with M+N interaction, tie forces. Every number reproduced by hand.
View the worked calculation →
Falsework
BS 5975:2019
400mm RC slab falsework: loads, lateral stability (2.5%W vs 1%W+wind), beam checks, standard slenderness with correct flagging of λ > 180. Backed by a 67-test suite.
View the worked calculation →
Founding Engineer Access
Access the Platform.
Shape Its Future.

LMT.Pro is open to founding engineers for the duration of the launch period — no cost, no commitment. Early users help define what gets built next. Founding access closes when commercial pricing launches.

Currently Live
Lifting Commandor
3-stage crane selection, ground load calculations and lifting plan generation.
●  Live — Founding Access
  • Crane selection — mobile & crawler
  • EN 13000 outrigger & ISO 4305 track calcs
  • PDF calculation reports with formula derivation
  • Auto-filled lifting plan — DOCX & PDF
Open Lifting Commandor →
Currently Live
Methods & Temp. Works
5 M&T modules live now. Formwork, open excavation, slope assessment and hoardings launching Q4 2026.
●  5 Modules Live
Open M&T Modules →
Coming Q4 2026
Further Modules
Completing the full M&T scope.
⏳  Launching Q4 2026
  • Open excavation design
  • Slope assessment & exclusion zones
  • Hoardings & fences
  • Formwork
Register Interest →
Founding access is complimentary for the duration of the launch period. Pricing will be announced ahead of full commercial launch — founding engineers receive advance notice and a preferential rate. No payment details are required at any stage during founding access.
User Reviews

What Engineers
Are Saying

Real feedback from founding engineers. All reviews are collected via the app and stored securely.

★★★★★
Loading reviews…
Leave a Review
Tried any LMT.Pro tool? Tell us what you think — it directly shapes what we build next.
Your Rating *
✓ Thank you — your review has been saved.
Contact

Get in Touch

Have a question, suggestion, or want to discuss the platform? Send us a message.

✓ Message received — we’ll get back to you shortly.
Stay Informed

Be Notified
When We Launch

Receive advance notice when new modules go live and before commercial pricing is announced.

No spam. Unsubscribe any time. Your data is never shared.

✓ Registered. You’ll hear from us before pricing is announced.