Wall formwork
Concrete pressure and checks for the plywood, walers, soldiers and ties of a double-sided wall form.
- CIRIA Report 108
- BS 5975:2019
- Concrete pressure from the pour rate, temperature and mix
- Plywood, waler and soldier bending, shear and deflection
- Tie forces row by row
- PDF calculation note with your project header
The tool assists — the responsible engineer checks and approves.