LMT.Pro
Tools

Utility protection slab

A reinforced concrete slab to carry plant over a buried pipe or cable, at the surface or on EPS.

  • BS EN 1992-1-1 + UK NA
  • BS EN 1990 + UK NA
  • BS EN 1997-1
  • BS 5975:2019
  • Slab thickness, length, bearing width and reinforcement
  • Stress on the utility against the asset owner's limit
  • Bending, shear and punching to EC2, formation bearing
  • PDF calculation note with your project header

The tool assists — the responsible engineer checks and approves.

Project
Utility and geometry

50 – 3000 mm

0.25 – 5 m

Plant and utility limit

10 – 1000 kN

100 – 1500 kPa

1 – 80 km/h

1 – 2

5 – 500 kPa

1 – 3

Ground

10 – 1000 kPa

Slab

16 – 50 MPa

250 – 600 MPa

20 – 75 mm

Inputs are saved on this device automatically.