Slab falsework — tube & fitting
A tube & fitting birdcage for a slab pour up to 4 m high: grid, bearers, standards, bracing and ground.
- BS 5975:2019
- BS EN 1991-1-4 + UK NA
- BS EN 39
- BS EN 74-1
- Standard grid, primary and secondary bearers
- Standards, forkheads, base jacks and sole plates
- Wind, bracing line by line and overturning
- PDF calculation note with your project header
The tool assists — the responsible engineer checks and approves.